Tube Spile
The tube spiles are used as tunnel pre support when ground consolidation through injection work is required. For easier installation, the tube spiles are prepared with conical cap for pushing into borehole, or drilled and percussed into borehole with a sacrificial or recyclable drill bit. Injection borehole’s perforation at every 300mm interval along the steel pipe is generally required.
Specification
Min. EN S235
Safety/Quality Approval
Steel pipe dimensions:
D38mm t 3.0mm, D42mm t 3.0mm, D48mm t 3.2mm
D51mm t 3.2mm, D51mm t 4.5mm, D60.5mm t 4.5mm
Supplied length- 3m, 4m, 5m, 6m in one piece
D38mm t 3.0mm, D42mm t 3.0mm, D48mm t 3.2mm
D51mm t 3.2mm, D51mm t 4.5mm, D60.5mm t 4.5mm
Supplied length- 3m, 4m, 5m, 6m in one piece