No. |
Project Name |
Sales Activities |
Client & Contractors |
Duration |
1 |
Freeway No. 4 Taichung Circle Line C712 Feng Yuan No. 1 & 2 Tunnel & Chung Keng River Bridge Construction |
Umbrella steel pipe roofing system / Self-drilling anchor / Lattice Girder / H Profile / Cement Mortar |
Pan Asia Corporation |
Oct. 2018 - |
2 |
Shihmen Reservoir Project Anti-Sludge Tunnel (First Phase) - Amuping Anti-Sludge Tunnel Construction |
Umbrella steel pipe roofing system / Self-drilling anchor / Lattice Girder |
BES Engineering Corporation |
Aug. 2018 - |
3 |
Autobahn Nr. 4 Taichung Circle Line C713 Feng Yuan Nr. 3 Tunnel & Nan Keng and Wu Niu Lan River Bridge Construction |
Umbrella steel pipe roofing system / Self-drilling anchor / Lattice Girder |
Fortune Construction Co., Ltd. |
Jun. 2018- |
4 |
Taiwan Taitung Jinlun East section, mechanical engineering and electronic technical C712B Project |
Self-drilling anchor |
Risheng Construction Co., Ltd. |
Jun. 2018- |
5 |
Xin Hu Shan Army Artillery Training Command Field Connection Road and South No.169 Realignment Project |
Lattice Girder |
Kai Yuan Construction Co., Ltd. |
Jun. 2017- |
6 |
Taiwan New Taipei City, San-Ying Rapid Transit System Design and Construct Project |
Lattice girder |
RSEA Engineering Corporation |
Oct. 2016 - |
7 |
Tainan City Baihe Dist, Baihe Reservoir Renovation Project - Flood Protection & Anti-sludge Tunnel Construction |
Umbrella steel pipe roofing system / Lattice girder / Self-drilling anchor / Cement mortar |
Raito Engineering Co., Ltd |
Sep. 2016 - |
8 |
Taiwan New Taipei City, Xindian Dist Second Phase of Construction of An-Keng Road 1 |
Umbrella steel pipe roofing system / Fully threaded GFRP rock bolt / Lattice girder / Fully threaded rock bolt / PU injection resin / Cement mortar / Monitoring instruments |
Fortune Construction Co., Ltd. |
Aug. 2016 - |
9 |
New Wu-San Ridge Headrace Tunnel |
Umbrella steel pipe roofing system / Tube spile / Lattice Girders / Fully threaded rock bolt / Self-drilling anchor / PU injection resin / Mortar |
Raito Engineering Co., Ltd. |
Nov. 2015 - |
10 |
Taiwan East Disc. Suhua Highway Renovation Project C1 - Chung Ren Tunnel Construction |
Umbrella steel pipe roofing system 4" / Swell friction bolt / PU injection resin / Liquid accelerator cartridge / Long distance drainage pipe |
New Asia Construction Co., Ltd. |
Aug. 2015 - Sep. 2016 |
11 |
Taiwan South-Link Highway Caopu - An Suo Section C2 Tunnel Construction |
Umbrella steel pipe roofing system 4" / Self-drilling anchor / Long distance drainage pipe |
Futsu Construction Co., Ltd. |
May. 2014 - |
12 |
Taiwan East Disc. Suhua Highway Renovation Project A1 - Su Ao Tunnel Construction |
Full threaded rock bolt / Cement mortar |
RSEA Engineering Construction |
Jun. 2014 - |
13 |
Ah Li Mountain Forest Railway 60K Embankment Repair Work Bypass Tunnel |
Umbrella steel pipe roofing system / Self-drilling anchor / Fully threaded rock bolt / PU injection resin / Cement mortar / Steel fiber |
Raito Engineering Co., Ltd. |
Feb. 2013 - Mar. 2015 |
14 |
Tainan Tsen Wen / Hushan / Baihe Reservoir Renovation Project - Flood Protection & Anti-sludge Tunnel Construction |
Umbrella steel pipe roofing system / Lattice Girder / Self-drilling anchor / Fully threaded rock bolt / PU injection resin / Welding wire web / Cement mortar |
Raito Engineering Co., Ltd |
Mar. 2013 - |
15 |
Taiwan East Disc. Suhua Highway Renovation Project A2 - Dong Ao Tunnel Construction |
Umbrella steel pipe roofing system / Tube spile / Fully threaded GFRP rock bolt / Lattice Girders / H-profile arch / Self-drilling anchor / Fully threaded rock bolt / PU injection resin / PVC membrane / Cement mortar |
Fortune Construction Co., Ltd. |
Mar. 2013 - |
16 |
Taiwan East Disc. Suhua Highway Renovation Project B1 -Dong Yueh Tunnel Construction |
Umbrella steel pipe roofing system / Tube spile / Self-drilling anchor / Mortar / Mortared drainage steel |
New Asia Construction Co., Ltd. |
Mar. 2013 - |
17 |
Taipei MRT Zhang Shu Wan -Nan Gang Extension Railroad Tunnel |
Umbrella steel pipe roofing system / Lattice girders / Self-drilling anchor / Fully threaded rock bolt |
RSEA Engineering Corporation |
Jul. 2012 - Oct. 2013 |
18 |
Ah Li Mountain Forest Railway 49K Embankment Repair Work Bypass Tunnel |
Umbrella steel pipe roofing system / Lattice girders / Self-drilling anchor / Fully threaded rock bolt / PU injection resin / Cement mortar / Steel fiber / Monitoring instrument |
Wah Chau Construction Co., Ltd. |
Jul. 2012 - Jan. 2014 |
19 |
Taiwan East Disc. Suhua Highway Renovation Project B3 - Gu Feng Tunnel Construction |
Umbrella steel pipe roofing system / Self-drilling anchor / PU injection resin / Long distance drainage pipe |
Kseco Engineering Co., Ltd. |
Jun. 2012 - Nov. 2015 |
20 |
Taiwan East Disc. Suhua Highway Renovation Project B2 - Guang Yin Tunnel Construction |
Umbrella steel pipe roofing system / Self-drilling anchor / PU injection resin / Long distance drainage pipe |
Kseco Engineering Co., Ltd. |
Jun. 2012 - May. 2015 |
21 |
Highway No.20 Annual Slope & Road Renovation after Typhoon Damage |
Self-drilling anchor |
Taiwan Highway Bureau 3rd Disc. Engineering Office |
Jan. 2012 - Dec. 2016 |
22 |
Eastern Railway Renovation Project CL212 Ji-Chiang Tunnel Construction |
Umbrella steel pipe roofing system / Tube spile / Fully threaded GFRP rock bolt / Lattice Girders / H-profile arch / Self-drilling anchor / Fully threaded rock bolt / PU injection resin / GFRP Face stabilization / Steel fiber / Cement mortar |
Fortune Construction Co., Ltd. |
Jan. 2012 - Dec. 2016 |
23 |
Eastern Railway Renovation Project CL314 San-Li Tunnel Construction |
Umbrella steel pipe roofing system / Self-drilling anchor |
Continental Engineering Corp. |
Jan. 2012 - Dec. 2013 |
24 |
Eastern Railway Renovation Project CL113 Fung Lin - Guan Fu Underground Tunnel Construction |
Umbrella steel pipe roofing system / Lattice girders / H-profile arch / Self-drilling anchor / Fully threaded rock bolt / Drainage rib membrane / Cement mortar |
Fortune Construction Co., Ltd. |
Jan. 2012 - Feb. 2013 |
25 |
Hushan Reservoir Project - Headrace Tunnel Construction |
Umbrella steel pipe roofing system / Tube spile / Lattice girders / Self-drilling anchor / Fully threaded rock bolt / PU injection resin / Cement mortar / Steel fiber |
Fortune Construction Co., Ltd. |
Jan. 2012 - Jul. 2012 |
26 |
Taipei MRT Zhang Shu Wan -Nan Gang Extension Railroad Tunnel |
Umbrella steel pipe roofing system / Lattice girders / Self-drilling anchor / Fully threaded rock bolt |
RSEA Engineering Corporation |
Jul. 2011 - Aug. 2012 |
27 |
Eastern Railway Renovation Project CL113 Fung Lin - Guan Fu Underground Tunnel Construction |
Umbrella steel pipe roofing system / Lattice girders / H profile arch / Self-drilling anchor / Fully threaded rock bolt / Cement Mortar / Drill Tool / Waterproofing membrane |
Fortune Construction Co., Ltd. |
May 2011 - Jan. 2014 |
28 |
Highway No.20 Renovation Sec. 82K + 500 ~ 95K + 508 |
Lattice girders / Self-drilling anchor |
Kai Yuan Construction Co., Ltd. |
May 2011 - 2014 |
29 |
Taipei MRT Xinzhuang Line Project CK570J |
Umbrella pipe roofing system / Polyurethane injection resin |
Continental Engineering Corp. |
Oct. 2010 - Nov. 2012 |
30 |
Dajia River-Ching San Power Plant Rehabilitation Plan Ventilation Shaft & Tunnel |
Umbrella steel pipe roofing system / Lattice girders / Fully threaded rock bolt / Cement Mortar / Polyurethane injection resin / Steel Wire Mesh / Liquid accelerator cartridge |
Futsu Construction Co., Ltd. |
Jul. 2010 - Jun. 2012 |
31 |
Eastern Railway Renovation Project CL314 San Li Tunnel Construction |
Umbrella pipe roofing system / Self-drilling anchor / Silicate injection resin |
Continental Engineering Corp. |
May 2010 - Feb. 2013 |
32 |
Eastern Railway Renovation Project CL212 Zhi Chiang Tunnel Construction |
Umbrella pipe roofing system / GFRP pipe injection system / Lattice Girders / H profile arch / Self-drilling anchor / Fully threaded rock bolt / Polyurethane injection resin / Silicate injection resin / Cement mortar |
Fortune Construction Co., Ltd. |
Apr. 2010 - Jul. 2016 |
33 |
Taiwan Taoyuan International Airport Access MRT System Construction Project CE01D |
Umbrella pipe roofing system / Lattice Girders / H profile arch / Self-drilling anchor / Fully threaded rock bolt / Cement mortar / Waterproofing Membrane |
Futsu Construction Co., Ltd. |
2010 - Mar. 2011 |